CD7044. TOTS 1C-Passage Planning and Navigation

搜索本栏目

请选择题集,开始学习或模拟考试。

题集简介

Seagull CBT 栏目提供自学题目。请选择一组题目,开始学习或模拟考试。

「Seagull CBT — CD7044. TOTS 1C-Passage Planning and Navigation」共有 1 个题集、25 道题。

学习

学习模式不限时。答题后可查看结果和正确选项,也可返回题目复习。

模拟考试

模拟考试最长 60 分钟,最多 50 道题。完成后可查看正确答案和成绩。

示例题目与答案

以下为题集中的示例。选择学习练习答题,或选择模拟考试检验知识。

What is the meaning of the term "margin of safety"?

单选

  • It is a line parallel to the track, within which the vessel will always be in safe water.✓ 正确答案
  • It is another phrase meaning "no-go areas".
  • It is not a phrase which should be used within the plan.
  • It is the distance from the nearest danger.
What is the UKC (Under Keel Clearance)?

单选

  • It is the vertical distance between the seabed and the deepest part of the ship.✓ 正确答案
  • It is an important part of the "pilot station to berth" section of the passage plan.
  • It is an important part of the "pilot station to berth" section of the passage plan for loaded tankers.
  • It is an important part of the "pilot station to berth" section of the passage plan for all tankers.
Why would you use risk assessment techniques during Passage Planning?

单选

  • To reduce, and where possible eliminate risks from navigational hazards.✓ 正确答案
  • To reduce, and where possible eliminate risks to the Bridge Team personnel during the passage.
  • There is no requirement for risk assessment to be used.
  • To comply with Flag State or Company regulations.
What is the meaning of the term "abort point"?

单选

  • It is the latest position where the vessel may abandon the planned passage and either return or stop safely.✓ 正确答案
  • It is any position on the passage where the vessel can abandon the planned passage.
  • It is the safe area, specified in the plan and marked on the chart, where the vessel can wait if the plan is abandoned.
  • It is not a phrase which should be used within the plan.
When is the UKC (Under Keel Clearance) calculation required to be completed?

单选

  • The UKC should be calculated and applied for all ships loading and discharging from ports, irrespective of any local regulations and requirements.✓ 正确答案
  • The UKC should be calculated for tankers while sailing to US ports.
  • The UKC should be calculated for loaded tankers while sailing to US ports.
  • The UKC should be calculated for all tankers while arriving and departing from US ports.