IG MARITIME 的国际模拟测试面向所有海员免费开放。注册一次即可保存进度,无限次备考!

CD7003. TOTS 1A-Mooring Equipment and Operations

搜索本栏目

请选择题集,开始学习或模拟考试。

题集简介

Seagull CBT 栏目提供自学题目。请选择一组题目,开始学习或模拟考试。

「Seagull CBT — CD7003. TOTS 1A-Mooring Equipment and Operations」共有 1 个题集、58 道题。

学习

学习模式不限时。答题后可查看结果和正确选项,也可返回题目复习。

模拟考试

模拟考试最长 60 分钟,最多 50 道题。完成后可查看正确答案和成绩。

示例题目与答案

以下为题集中的示例。选择学习练习答题,或选择模拟考试检验知识。

Is it acceptable to travel at the speed of four knots in the approach to the berth?

单选

  • It's too fast.✓ 正确答案
  • It's normal.
  • It's sufficient for manoeuvring.
  • It is up to the Pilot to decide.
What is the recommended procedure if your vessel is equipped with "self-stowing automatic tension" winches and your vessel is moored alongside the loading jetty with fixed loading arms?

单选

  • All mooring ropes should be left secured by the manual mooring brakes and all winches should be left out of gear.✓ 正确答案
  • All winches should be kept in "auto-tension" mode.
  • Head and stern line winches should be kept in "auto-tension" mode and breast and spring ropes should be kept manually secured by brakes.
  • Spring line winches should be kept in "auto-tension" mode and all other ropes should be kept secured by manual brakes.
What is it important to discuss during the pre-berthing briefing between the Master and the ship's officers?

单选

  • The specific berthing operation for the forthcoming berthing, the use of tugs and the position of the mooring ropes/wires to be used.✓ 正确答案
  • Which officer will be on the forecastle and which on the stern during mooring operations.
  • The size (pulling power) of the tugs to be used during berthing.
  • How many crew members should be called for berthing operations.
What is an advantage of split-type mooring drums?

单选

  • All three answers.✓ 正确答案
  • The mooring wires are not "crushed" under load.
  • There is a smaller chance that the mooring rope will be "jammed" on the storage part of reel.
  • The use of the split drum uses the winch braking capacity to its maximum.
When should the emergency towing wires (fire wires) be deployed?

单选

  • When the vessel is berthed at the terminals and tugs are available.✓ 正确答案
  • Only on terminals where the vessel is secured alongside the jetty.
  • Whenever the vessel is not in navigation.
  • Whenever the vessel is anchored or berthed at the terminals.

开始前须知

开始前需要注册吗?

访客可试用 23 分钟。免费注册后可继续学习、保存进度并复习错题。

题目是什么语言?

题目和选项保留原语言。可以单独切换界面语言。

成绩可以作为正式文件吗?

不可以。这是自主练习,成绩无法替代授权机构的考试、证书或知识考核。