IG MARITIME 的国际模拟测试面向所有海员免费开放。注册一次即可保存进度,无限次备考!

CD0316. Anchor handling operation

搜索本栏目

请选择题集,开始学习或模拟考试。

题集简介

Seagull CBT 栏目提供自学题目。请选择一组题目,开始学习或模拟考试。

「Seagull CBT — CD0316. Anchor handling operation」共有 1 个题集、29 道题。

学习

学习模式不限时。答题后可查看结果和正确选项,也可返回题目复习。

模拟考试

模拟考试最长 60 分钟,最多 50 道题。完成后可查看正确答案和成绩。

示例题目与答案

以下为题集中的示例。选择学习练习答题,或选择模拟考试检验知识。

Where should disconnected rig anchor chain be kept on an anchor handling vessel? Select the ONE best answer.

单选

  • In the dedicated rig chain lockers on the vessel.✓ 正确答案
  • In a pile on deck.
  • In the vessel’s own chain locker.
  • In a deck container.
Which ONE of the options correctly completes the following statement? ‘When lowering a rig anchor the deck crew on an anchor handling vessel...

单选

  • ...should clear the working deck’.✓ 正确答案
  • ...should observe the progress from the stern area’.
  • ...should start clearing up the working deck’.
  • ...should be stood down’.
With regard to a rig’s anchor chain system. Why are sub-surface buoys attached to the wire insert, fitted to clear a sub-sea obstruction? Select the ONE correct answer.

单选

  • To support the wire over the obstruction.✓ 正确答案
  • To mark the position of the chain and wire join.
  • To act as a warning to surface craft.
  • To carry an underwater acoustic system.
How is a rig anchor placed in position on the sea floor by an anchor handling vessel? Select the ONE correct answer.

单选

  • It is lowered using a pennant wire.✓ 正确答案
  • It is allowed to free fall over the stern roller.
  • It is lowered on the anchor chain.
  • It is lowered using a crane.
What should be done with a decked and disconnected anchor on an anchor handling vessel? Select the ONE correct answer.

单选

  • It should be secured to the barrier.✓ 正确答案
  • It should be returned to the rig.
  • It should be hauled up hard to the anchor winch.
  • It should be left close to the stern roller.

开始前须知

开始前需要注册吗?

访客可试用 23 分钟。免费注册后可继续学习、保存进度并复习错题。

题目是什么语言?

题目和选项保留原语言。可以单独切换界面语言。

成绩可以作为正式文件吗?

不可以。这是自主练习,成绩无法替代授权机构的考试、证书或知识考核。