IG MARITIME 的国际模拟测试面向所有海员免费开放。注册一次即可保存进度,无限次备考!

CD0301. Crane Operations

搜索本栏目

请选择题集,开始学习或模拟考试。

题集简介

Seagull CBT 栏目提供自学题目。请选择一组题目,开始学习或模拟考试。

「Seagull CBT — CD0301. Crane Operations」共有 1 个题集、67 道题。

学习

学习模式不限时。答题后可查看结果和正确选项,也可返回题目复习。

模拟考试

模拟考试最长 60 分钟,最多 50 道题。完成后可查看正确答案和成绩。

示例题目与答案

以下为题集中的示例。选择学习练习答题,或选择模拟考试检验知识。

What does this approved signal mean?

单选

  • Stop (interruption or end of movement)✓ 正确答案
  • Hoist
  • Raise jib
  • Slew right
Which of the following factors contribute to the safe and efficient operation of a shipboard service crane?

多选

  • Competence✓ 正确答案
  • Awareness✓ 正确答案
  • Teamwork✓ 正确答案
  • Maintenance✓ 正确答案
The engine-room crane is to be used for the routine transfer of spare parts from the storeroom to the after end of the engine-room prior to use in the steering flat. The spares are all well within the safe working load of the crane and easily handled with slings and brackets. The operation is planned for late morning and the duty engine crew are available to assist. The weather is good and the crane is in full working order. How might the pre-operations briefing take place?

单选

  • This is a routine matter. The use of the crane can be adequately covered in the daily work meeting at the start of the day, but may still need to be noted as discussed on a pre-operations checklist✓ 正确答案
  • The use of the engine-room crane is always considered an extra-ordinary operation and requires an extra risk assessment. A special briefing must take place, involving all the duty engine-room personnel
While performing a 6 monthly check on a bow hose-handling crane, you remove an inspection panel and discover the seal around it broken, the surrounding steel rusty, and 10 cm of salt-water pooled at the bottom. Select all of the corrective procedures you will follow from the list below. (Select all applicable answers)

多选

  • Remove the water and dry the chamber✓ 正确答案
  • Replace the seal on the panel✓ 正确答案
  • Treat and re-coat the area of rusty steel✓ 正确答案
  • Following repair, securely re-fit the panel✓ 正确答案
  • Report the details, so that the appropriate entries can be made in the maintenance records✓ 正确答案
  • Drill a hole in the bottom of the casing so that any more water drains away automatically
  • Leave the panel loose, so that it may be checked more frequently
  • Place absorbent cloth in the bottom of the chamber to catch any more water that leaks in
When should the emergency stop on a crane be tested? (Select all applicable answers)

多选

  • At periodic intervals, as required under the Planned Maintenance system✓ 正确答案
  • Prior to the commencement of lifting operations✓ 正确答案
  • At any other time felt necessary or prudent✓ 正确答案

开始前须知

开始前需要注册吗?

访客可试用 23 分钟。免费注册后可继续学习、保存进度并复习错题。

题目是什么语言?

题目和选项保留原语言。可以单独切换界面语言。

成绩可以作为正式文件吗?

不可以。这是自主练习,成绩无法替代授权机构的考试、证书或知识考核。