This type of shipboard resource is depleting and nonrenewable.
单选
navigation equipment
time✓ 正确答案
tools
machinery
Which of the following options is NOT considered a shipboard resource?
单选
shipboard officers
fuel oil
pilot boat✓ 正确答案
chipping hammer
The vessel is approaching the pilot station. Two crucial tasks should be carried out simultaneously - anchor preparation and rigging the pilot ladder. The Bosun, two OS, the AB and the Second Mate are the only available crew at that time. If you were the Master, to whom would you assign these two tasks?
单选
The Bosun and the first OS will prepare the anchor while the AB, the second OS and the Second Mate will rig the pilot ladder.✓ 正确答案
The two OS will rig the pilot ladder while the Bosun and the AB will prepare the anchor.
The Bosun and the Second Mate will prepare the anchor, while the two OS and the AB will rig the pilot ladder.
The Bosun and the Oiler will rig the pilot ladder while the AB and the two OS will prepare the anchor.
In transiting Panama Canal, which of the following measures illustrates the resource levelling method, Split?
单选
The vessel will be anchored upon reaching Gatun Lake and only one shipboard personnel will be retained in the fwd and aft stations. The rest of the crew can rest.
During mealtimes, it is possible to alternate the bridge duty of the Second Mate and the Third Mate, and the Chief Mate and the Bosun at the fwd station.
Panama Canal transit is very crucial that other maintenance jobs should be suspended while the vessel is in transit. Also, it is necessary to delay ballast transfer to adjust the vessel's trim after crossing Panama canal.
Securing of deck after transit may be arranged in such a way that the Second Mate and two ratings will be responsible for the aft station, while the Chief Mate and Bosun will be responsible for fwd station.✓ 正确答案
Shipboard resource management process is characterized by four main steps arranged in which order?