Apart from bunker fraud relating to fuel quality, there is also bunker fraud that relates to fuel quantity. Please identify from the following list the five issues that are bunker QUANTITY fraud.
多选
Shortening of measuring tapes used by the barge/supplier✓ 正确答案
Falsified tank tables for the bunker barge supply tanks✓ 正确答案
Detection of off-specification fuel oil during pre-test
Deliberately declaring incorrect densities and temperatures of the delivered fuel or fuels✓ 正确答案
Adding water✓ 正确答案
Adding air to the fuel, the so-called “cappuccino effect”✓ 正确答案
A bunker quality claim may include several issues depending on the extent of loss and associated cost. Which of the following statements describes the issues that may be included in a quality claim? Tick all that you think apply.
多选
Loss of time✓ 正确答案
Cost of de-bunkering and re-supplying ship with fuel oil of the correct grade✓ 正确答案
Cost of replacing damaged machinery, parts and labour✓ 正确答案
Cost of pursuing the claim including legal costs, survey costs, additional analyses✓ 正确答案
Indemnity against the consequences of receiving fuel oil that does not comply with the requirement of MARPOL annex 6✓ 正确答案
Which one of the following is the correct name for the main document which forms the basis for indicating grievances encountered in bunkering to settle disputes and claims relating to quality and quantity of the bunker oil delivered?
单选
Letter of Claims
Letter of Protest✓ 正确答案
Letter of Indemnity
Letter of Disputes
The Chief Engineer is in charge of the whole process of bunkering and his position demands certain responsibilities. Pick four of the following selections below which are the responsibility of the Chief Engineer during the whole bunkering process.
多选
The Chief Engineer takes control of the whole bunkering process✓ 正确答案
The Chief Engineer directly communicates with the barge master and everyone involved in the bunkering✓ 正确答案
As the one in charge, the Chief Engineer delegates tasks to others✓ 正确答案
The Chief Engineer makes a risk assessment of the tasks required for bunkering✓ 正确答案
The Chief Engineer personally monitors the pumping system during the bunker operation
The Chief Engineer signs all maintenance checklists prior to the bunkering
Normally, as a local requirement in a Singapore bunkering Port, 3 samples should be taken on board ship or by the buyer. Which three of the following correctly describe these samples?
多选
One retained sample for the vessel✓ 正确答案
One SOLAS-sample for the vessel’s retention
One MARPOL sample for the vessel’s retention✓ 正确答案
One sample for the vessel, if the vessel is on a fuel quality testing programme.✓ 正确答案