IG MARITIME 的国际模拟测试面向所有海员免费开放。注册一次即可保存进度,无限次备考!

CD0125. Hot work

搜索本栏目

请选择题集,开始学习或模拟考试。

题集简介

Seagull CBT 栏目提供自学题目。请选择一组题目,开始学习或模拟考试。

「Seagull CBT — CD0125. Hot work」共有 1 个题集、71 道题。

学习

学习模式不限时。答题后可查看结果和正确选项,也可返回题目复习。

模拟考试

模拟考试最长 60 分钟,最多 50 道题。完成后可查看正确答案和成绩。

示例题目与答案

以下为题集中的示例。选择学习练习答题,或选择模拟考试检验知识。

Fire safety precautions that may be taken in preparation for hot work might include which of the following? (Select all applicable answers)

多选

  • Briefing personnel on action to be taken in the event of an emergency.✓ 正确答案
  • Dressing personnel in fire fighting gear to be fully ready to move immediately in the event of an emergency.✓ 正确答案
  • Bringing extinguishers and other equipment to a stand-by location.✓ 正确答案
  • Starting the main or emergency fire pump and running and charging fire hoses.✓ 正确答案
  • Rigging fire curtains and blankets to contain welding sparks and molten slag.✓ 正确答案
  • “Damping down” or performing boundary cooling in adjacent spaces.✓ 正确答案
  • Arranging for the testing of the atmosphere at the hot work site and in adjacent spaces.✓ 正确答案
  • Inerting adjacent spaces, where appropriate.✓ 正确答案
Which of the following areas may need to be checked for the presence of combustible materials which may be affected by heat and sparks before any hot work is commenced? (Select all applicable answers)

多选

  • At the intended hot work site.✓ 正确答案
  • Above the work site.✓ 正确答案
  • Below the work site.✓ 正确答案
  • Adjacent to the work site.✓ 正确答案
Which of the following is the definition of a “Risk Assessment”?

单选

  • A thorough and careful analysis of what, in the range of operations, could cause harm, so that decisions can be made as to whether enough precautions have been taken, or whether more should be done to prevent harm.✓ 正确答案
  • A brief visual check of the work site carried out immediately before the work is started, to ensure that the area is safe and clean.
  • An investigation into the circumstances which have led to an incident, such as an explosion that occurred during a welding repair.
  • The full and detailed briefing of all team members involved in a work task, to ensure that everyone is aware of their roles and responsibilities.
A hot work modification is to be carried out in the middle of the after transverse bulkhead of an engine room spare gear store. Which of the following could be at risk of damage directly on the other side of the bulkhead in the fitter’s workshop? (Select all applicable answers)

多选

  • Paint.✓ 正确答案
  • Wooden shelving.✓ 正确答案
  • Welding electrodes, contained in a plastic wallet, stored on the wooden shelves.✓ 正确答案
  • Electrical cables on the opposite transverse bulkhead of the fitter’s workshop.
  • The electric light fittings on the deck head in the fitter’s workshop.
  • Spare small bore air and hydraulic hoses hanging in racks on the adjacent longitudinal bulkhead in the fitter’s workshop.
Is a cargo tank diagonally across the point at which longitudinal and transverse tank bulkheads meet considered to be adjacent for the purposes of hot work requirements?

单选

  • Yes.✓ 正确答案
  • No.

开始前须知

开始前需要注册吗?

访客可试用 23 分钟。免费注册后可继续学习、保存进度并复习错题。

题目是什么语言?

题目和选项保留原语言。可以单独切换界面语言。

成绩可以作为正式文件吗?

不可以。这是自主练习,成绩无法替代授权机构的考试、证书或知识考核。