示例题目与答案

以下为题集中的示例。选择学习练习答题,或选择模拟考试检验知识。

The wet film of paint, which is applied, bears a direct relationship to the final dry film thickness of the coating. Taking wet film measurements can be very important. Why is it important to take these measurements as quickly as possible?

单选

  • To avoid the fresh coat softening the coats underneath leading to possible wrong readings.
  • So that the painter is disturbed as little as possible.
  • To obtain as close a reading to the actual wet film as possible.✓ 正确答案
Which of the following statements best describes one of the main advantages of Hydroblasting with fresh water as opposed to Dry Abrasive Blasting?

单选

  • Produces a Surface Profile to aid adhesion of coatings to the surface.
  • Only requires air power for operation.
  • As well as removing corrosion products it also removes salt contamination.✓ 正确答案
  • The prepared surfaces will flash rust.
A large area of exposed deck is to be blasted to an agreed standard of SA2 before application of an epoxy paint system. In the vicinity of some pipes where difficult access means that the blasting is not able to remove all the corrosion. What do you do?

单选

  • Reject the whole blasted areas until blasting is redone to the correct SA2 standard.
  • Accept the blasted areas and go ahead with painting.
  • Discuss the various options with the contractor.✓ 正确答案
Which are the 3 factors, which help contribute to correct performance of a paint system.

多选

  • The Paint itself✓ 正确答案
  • The Correct Specification
  • The Correct Intervals between coats of paint
  • That clean Airless spray equipment is used
  • Proper Surface Preparation✓ 正确答案
  • The amount of Time and Money spent on the paint and the application
  • Proper Application of Paint✓ 正确答案
A large area of exposed deck is to be blasted to an agreed standard of SA2 before application of an epoxy paint system. In the vicinity of some pipes where difficult access means that the blasting is not able to remove all the corrosion. What do you do?

单选

  • Reject the whole blasted areas until blasting is redone to the correct SA2 standard.
  • Accept the blasted areas and go ahead with painting.
  • Discuss the various options with the contractor.✓ 正确答案

开始前须知

开始前需要注册吗?

访客可试用 23 分钟。免费注册后可继续学习、保存进度并复习错题。

题目是什么语言?

题目和选项保留原语言。可以单独切换界面语言。

成绩可以作为正式文件吗?