CD0013. Tank II
搜索本栏目请选择题集,开始学习或模拟考试。
CD0013. Tank II
42 道题
题集简介
Seagull CBT 栏目提供自学题目。请选择一组题目,开始学习或模拟考试。
「Seagull CBT — CD0013. Tank II」共有 1 个题集、42 道题。
学习
学习模式不限时。答题后可查看结果和正确选项,也可返回题目复习。
模拟考试
模拟考试最长 60 分钟,最多 50 道题。完成后可查看正确答案和成绩。
示例题目与答案
以下为题集中的示例。选择学习练习答题,或选择模拟考试检验知识。
What was the size limitation when the MARPOL Annex I made COW mandatory for new crude oil tankers?
单选
During discharge and COW operations of a crude oil tanker it is important to monitor the Inert Gas (IG) quality and pressure. What is the procedure if the IG system fails during such operation?
单选
When the discharge of an oil tanker is completed, who signs the chief officer’s reception documents for cargo discharged?
单选
The IG produced on the crude oil tankers will normally contain some oxygen. What are the requirements for the Oxygen content in the IG during discharge, cow and tank cleaning?
单选
Once an oil tanker is securely moored alongside the discharge terminal, who is normally the first to board the vessel?
单选
开始前须知
开始前需要注册吗?
访客可试用 23 分钟。免费注册后可继续学习、保存进度并复习错题。
题目是什么语言?
题目和选项保留原语言。可以单独切换界面语言。
成绩可以作为正式文件吗?
不可以。这是自主练习,成绩无法替代授权机构的考试、证书或知识考核。
