IG MARITIME 的国际模拟测试面向所有海员免费开放。注册一次即可保存进度,无限次备考!

11_CES_EO4

搜索本栏目

请选择题集,开始学习或模拟考试。

题集简介

ANR 栏目提供自学题目。请选择一组题目,开始学习或模拟考试。

「ANR — EN-EO4-OAM-CS — 11_CES_EO4」共有 1 个题集、427 道题。

学习

学习模式不限时。答题后可查看结果和正确选项,也可返回题目复习。

模拟考试

模拟考试最长 60 分钟,最多 50 道题。完成后可查看正确答案和成绩。

示例题目与答案

以下为题集中的示例。选择学习练习答题,或选择模拟考试检验知识。

How is the capacity of this type of refrigeration installation controlled ?题目图片

单选

  • By the compressor unloader.
  • By the expansion valve.
  • By the solenoid valve.
  • No capacity control is fitted.✓ 正确答案
Prior to starting the distillate pump, item No 7, it is necessary to make sure that ............................ in order to avoid the pump running dry.题目图片

单选

  • water is visible in the sight glass of the evaporator.✓ 正确答案
  • the discharge valve of the pump is shut.
  • the vacuum in the evaporator is still minimum.
  • the evaporator is full and under presuure.
If when you start up a purifier it does not come up to the desired revolutions, or it takes too long a time to come up to the required revolutions, you should change the ..............

单选

  • purifier ball bearings.
  • friction pad linings.✓ 正确答案
  • gravity disc.
  • O-rings and seal set of the bowl.
What is a telemotor system?

单选

  • Hydraulic actuation of steering rams.
  • Transfer of steering signals from wheel to steering gear.✓ 正确答案
  • Hand actuation of steering gear.
  • Steering gear feedback system.
What boiler mountings must be dismantled for inspection during survey?

单选

  • Safety valves.
  • Gauge glass & valve components.
  • Feed water check valves.
  • All boiler mountings.✓ 正确答案

开始前须知

开始前需要注册吗?

访客可试用 23 分钟。免费注册后可继续学习、保存进度并复习错题。

题目是什么语言?

题目和选项保留原语言。可以单独切换界面语言。

成绩可以作为正式文件吗?

不可以。这是自主练习,成绩无法替代授权机构的考试、证书或知识考核。