U odjeljku Seagull CBT dostupna su pitanja za samostalnu pripremu. Odaberite skup pitanja za učenje ili probni ispit.

„Seagull CBT — CD7021. TOTS 1B-Engine Room Operations-special circumst..” sadrži 33 pitanja u 1 skupova.

Učenje

Učenje nema vremenskog ograničenja. Nakon odgovora dobit ćete povratnu informaciju i točne opcije. Možete ponoviti pitanje ili temu.

Probni ispit

Probni ispit traje do 60 minuta i uključuje do 50 pitanja iz odabranog skupa. Rješenja i rezultati prikazuju se nakon završetka.

Primjeri pitanja i odgovora

Primjeri su iz objavljenog skupa. Odaberite učenje za vježbu redom ili probni ispit za provjeru znanja.

On a slow speed main engine, the engine can be brought back into service after extinguishing a scavenge fire..

Jedan točan odgovor

  • only after the cause of the fire is determined and the scavenge space cleaned out and inspected for damage.✓ Točan odgovor
  • as soon as the bridge confirms that the engine may be restarted.
  • only after the engine unit(s) in way of the fire have been fully overhauled.
  • once the engine has been turned over on the turning gear to ensure that it turns freely.
The safeguard against starting a slow speed direct drive engine with the fuel cam in the incorrect position is..

Jedan točan odgovor

  • a wrong way alarm and interlock.✓ Točan odgovor
  • a wrong way alarm only.
  • a fuel cut off interlock only.
  • not fitted as it will automatically correct itself.
Unavailability of stand-by coolant supply pumps is..

Jedan točan odgovor

  • significant and must be rectified as soon as possible.✓ Točan odgovor
  • significant and must be rectified before the engine is started.
  • not very significant and UMS operation of the engine room may be continued.
  • not very significant as one pump is enough for cooling.
On a vessel with 2 generators, while preparation is being made to depart on a 3 day voyage, one generator breaks down but cannot be repaired due to lack of a spare part. What should you do?

Jedan točan odgovor

  • Cancel the departure and do not sail until the generator is back in service or a backup package generator is fitted.✓ Točan odgovor
  • Sail as planned and have the generator repaired in the next port as the voyage is very short.
  • Advise the office of the problem and agree to sail as the spare part will be arranged for the next port.
  • Sail as planned as the owner's representative is insisting that the vessel must not be delayed.
How is it ensured that important operations are carried out according to set procedures?

Jedan točan odgovor

  • By using the appropriate critical operations check list.✓ Točan odgovor
  • By following the Chief Engineer's standing orders.
  • By using the manufacturer's operating / instruction manuals.
  • By using the Company operating manual.

Prije početka

Trebam li se registrirati prije početka?

Pristup za goste traje 23 minuta. Besplatno se registrirajte za nastavak, spremanje napretka i pregled pogrešaka.

Na kojem su jeziku pitanja?

Pitanja i ponuđeni odgovori ostaju na izvornom jeziku. Jezik sučelja možete promijeniti zasebno.

Mogu li koristiti rezultat kao službeni dokument?

Ne. Ovo je samostalna vježba. Rezultat ne zamjenjuje ispit, potvrdu ni provjeru znanja ovlaštene ustanove.