Svi međunarodni probni testovi na platformi IG MARITIME besplatni su za pomorce. Registrirajte se jednom da biste spremili napredak i vježbali bez ograničenja.

CD0420. Lockout Tagout

Pretraži ovaj odjeljak

Odaberite skup pitanja i započnite učenje ili probni ispit.

O ovom skupu

U odjeljku Seagull CBT dostupna su pitanja za samostalnu pripremu. Odaberite skup pitanja za učenje ili probni ispit.

„Seagull CBT — CD0420. Lockout Tagout” sadrži 10 pitanja u 1 skupova.

Učenje

Učenje nema vremenskog ograničenja. Nakon odgovora dobit ćete povratnu informaciju i točne opcije. Možete ponoviti pitanje ili temu.

Probni ispit

Probni ispit traje do 60 minuta i uključuje do 50 pitanja iz odabranog skupa. Rješenja i rezultati prikazuju se nakon završetka.

Primjeri pitanja i odgovora

Primjeri su iz objavljenog skupa. Odaberite učenje za vježbu redom ili probni ispit za provjeru znanja.

You are going to work on equipment that has been isolated, but which was previously pressurised or full of fluid. Which TWO of these precautions should be followed? Select the TWO best answers.

Više točnih odgovora

  • Use any drain and vent valves fitted, checking that they are clear.✓ Točan odgovor
  • Loosen the bolts at off flanges but leaving the nuts on. Then just break the joint at the flange.✓ Točan odgovor
  • Give the isolating valves extra force with a wheel key.
  • Fully open a flange at the top of the equipment first.
How can safe isolation be maintained when more than one person is working on the same system, for instance in dry-dock? Select the ONE best answer.

Jedan točan odgovor

  • Each person should apply their own locks at the points of isolation.✓ Točan odgovor
  • There should be a verbal agreement to check with each other before restoring the equipment to service.
  • One person should agree to take charge of the situation.
  • They should leave the locking arrangements to the Master or Chief Engineer.
If the equipment you are working on can move downwards under gravity, what should you do to keep safe? Select the ONE best answer.

Jedan točan odgovor

  • Make sure that it is securely locked into position or properly supported.✓ Točan odgovor
  • Always work from above it.
  • Make sure that no-one can walk underneath it.
  • Only do the job when in port, so that the ship is not rolling.
If the person that applied the lock and tag out to a system is not available, what should be done when work is completed? Select the ONE best answer.

Jedan točan odgovor

  • Follow the on board procedure for such an event.✓ Točan odgovor
  • The Chief Engineer or Chief Mate will remove them.
  • Anyone who has been involved in the work can remove them.
  • Leave them in place till the original person is available.
You have been working on electrical, pneumatic or hydraulic equipment. What should be done about the controls for the equipment before re-energising it? Select the ONE correct answer.

Jedan točan odgovor

  • The controls should be put into a safe position, usually the ‘off’ position.✓ Točan odgovor
  • The controls should be checked to make sure they are in the same position they were when the work started.
  • Nothing needs to be checked, the equipment is not likely to start.
  • The controls should be placed to the ‘on’ position.

Prije početka

Trebam li se registrirati prije početka?

Pristup za goste traje 23 minuta. Besplatno se registrirajte za nastavak, spremanje napretka i pregled pogrešaka.

Na kojem su jeziku pitanja?

Pitanja i ponuđeni odgovori ostaju na izvornom jeziku. Jezik sučelja možete promijeniti zasebno.

Mogu li koristiti rezultat kao službeni dokument?

Ne. Ovo je samostalna vježba. Rezultat ne zamjenjuje ispit, potvrdu ni provjeru znanja ovlaštene ustanove.