CD7021. TOTS 1B-Engine Room Operations-special circumst..

Maghanap sa seksyong ito

Pumili ng pangkat ng mga tanong at magsimulang mag-aral o kumuha ng pagsusulit.

Tungkol sa pangkat na ito

May mga tanong sa Seagull CBT para sa sariling pag-aaral. Pumili ng pangkat para magsimulang mag-aral o kumuha ng pagsusulit.

May 33 tanong sa 1 pangkat ang “Seagull CBT — CD7021. TOTS 1B-Engine Room Operations-special circumst..”.

Pag-aaral

Walang timer sa pag-aaral. Makikita ang resulta at tamang sagot pagkatapos sumagot. Maaari mong balikan ang tanong at ulitin ang paksa.

Pagsusulit

Hanggang 60 minuto at 50 tanong mula sa napiling pangkat ang pagsusulit. Makikita ang mga tamang sagot at resulta kapag tapos na.

Mga halimbawang tanong at sagot

Galing sa pangkat na ito ang mga halimbawa. Piliin ang Pag-aaral para isa-isahin ang mga tanong, o Pagsusulit para suriin ang kaalaman mo.

On a slow speed main engine, the engine can be brought back into service after extinguishing a scavenge fire..

Isang tamang sagot

  • only after the cause of the fire is determined and the scavenge space cleaned out and inspected for damage.✓ Tamang sagot
  • as soon as the bridge confirms that the engine may be restarted.
  • only after the engine unit(s) in way of the fire have been fully overhauled.
  • once the engine has been turned over on the turning gear to ensure that it turns freely.
The safeguard against starting a slow speed direct drive engine with the fuel cam in the incorrect position is..

Isang tamang sagot

  • a wrong way alarm and interlock.✓ Tamang sagot
  • a wrong way alarm only.
  • a fuel cut off interlock only.
  • not fitted as it will automatically correct itself.
Unavailability of stand-by coolant supply pumps is..

Isang tamang sagot

  • significant and must be rectified as soon as possible.✓ Tamang sagot
  • significant and must be rectified before the engine is started.
  • not very significant and UMS operation of the engine room may be continued.
  • not very significant as one pump is enough for cooling.
On a vessel with 2 generators, while preparation is being made to depart on a 3 day voyage, one generator breaks down but cannot be repaired due to lack of a spare part. What should you do?

Isang tamang sagot

  • Cancel the departure and do not sail until the generator is back in service or a backup package generator is fitted.✓ Tamang sagot
  • Sail as planned and have the generator repaired in the next port as the voyage is very short.
  • Advise the office of the problem and agree to sail as the spare part will be arranged for the next port.
  • Sail as planned as the owner's representative is insisting that the vessel must not be delayed.
How is it ensured that important operations are carried out according to set procedures?

Isang tamang sagot

  • By using the appropriate critical operations check list.✓ Tamang sagot
  • By following the Chief Engineer's standing orders.
  • By using the manufacturer's operating / instruction manuals.
  • By using the Company operating manual.

Bago magsimula

Kailangan bang magparehistro bago magsimula?

May 23 minutong guest access. Magparehistro nang libre para magpatuloy, ma-save ang progreso at balikan ang mga pagkakamali.

Anong wika ang gamit sa mga tanong?

Nananatili ang orihinal na wika ng mga tanong at opsyon. Puwedeng baguhin nang hiwalay ang wika ng interface.

Maaari bang gamiting opisyal na dokumento ang resulta?

Hindi. Para sa sariling pagsasanay ito. Ang resulta ay hindi kapalit ng pagsusulit, sertipiko o pagtatasa ng awtorisadong organisasyon.