All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

EN-IEB.AEN / OE2, OE3 / 6

Search this section

Choose a question set and start learning or take an exam.

About this collection

The ANR bank contains many sets with original names and codes, including navigation, safety and equipment topics. Select a module by name or use question search.

“ANR — IEB.AEN-Operational — EN-IEB.AEN / OE2, OE3 / 6” contains 73 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

When the operating handle is in the 'off' position, which master switch contacts for the winch shown in the illustration are closed?Question illustration

One correct answer

  • 'MS-DB & OL'
  • 'MS-3, 5, 6, 7, & 8'
  • 'MS-LVa & OL'
  • 'MS-3, 7 & Reset'✓ Correct answer
A circuit breaker and a fuse have a basic similarity in that they both

One correct answer

  • can be reset to energize the circuit
  • should open the circuit when overloaded✓ Correct answer
  • will burn out when an over current flow develops
  • all of the above
Electrical circuits are protected against overheating by means of a/an

One correct answer

  • circuit breaker✓ Correct answer
  • amplifier
  • diode
  • capacitor
A circuit is protected from overheating by a/an

One correct answer

  • pyrometer
  • thermal overload relay✓ Correct answer
  • magnetic contactor
  • overload transformer
Which of the listed conditions occur when selection is made for 'third point hoist' on the winch shown in the illustration?Question illustration

One correct answer

  • Master switch contacts "5", "6", "7", "8", and "9" close.
  • Contactors '2M', '3M', '4M' and '1A' pick up.
  • Contactors '1M', 3M', '1A' and '2A' drop out.
  • Master switch contacts "3","4", "6", "8", and "9" close.✓ Correct answer

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.