IG MARITIME 的国际模拟测试面向所有海员免费开放。注册一次即可保存进度,无限次备考!
请选择题集,开始学习或模拟考试。
题集简介
Techcross IBT 栏目提供自学题目。请选择一组题目,开始学习或模拟考试。
「Techcross IBT」共有 1 个题集、56 道题。
学习
学习模式不限时。答题后可查看结果和正确选项,也可返回题目复习。
模拟考试
模拟考试最长 60 分钟,最多 50 道题。完成后可查看正确答案和成绩。
示例题目与答案
以下为题集中的示例。选择学习练习答题,或选择模拟考试检验知识。
Choose the wrong one regarding checking when sampling water does not flow into CLX
单选
- -Sampling Line Check
- -Check operating of APU and Clean Y-Strainer
- -check TSU solenoid valve
- +check ANU solenoid valve✓ 正确答案
Choose the wrong one regarding countermeasure for [CODE 701] Communication Faii(GDS).
单选
- -Check the value at GDS and HMI
- -About 180 seconds is required for booting. Time can be checked by timer of GDS
- -GDS should be calibrated if '0% LEL' is not displayed
- +Turn off TSU✓ 正确答案
Choose the wrong one regarding EM cleaning.
单选
- -EWU tank is filled with fresh water
- -Use a citric acid
- -Every 100hrs operation time. EM should be cleaned with EWU
- +Citric acid's volume is used as much as possible✓ 正确答案
Choose what to do after CLX priming
单选
- -Priming
- -fill the neutralizer.
- -Replace CLX Reagent.
- +EM Cleaning✓ 正确答案
Choose the correct one regarding countermeasure for [CODE 701] Communication Fail(CIM)
单选
- -Check RTU communication at HMI
- -If PLC Err Lamp is "On", turrn the TSU power off and turn on
- +Check electrical equipment referring to "COM-TB" at PDE drawing✓ 正确答案
- -Check the PRU of ECU
开始前须知
开始前需要注册吗?
访客可试用 23 分钟。免费注册后可继续学习、保存进度并复习错题。
题目是什么语言?
题目和选项保留原语言。可以单独切换界面语言。
成绩可以作为正式文件吗?
不可以。这是自主练习,成绩无法替代授权机构的考试、证书或知识考核。